Good work NBN/their contractors on Ivo Whitton Circuit

Prior to NBN work:

After NBN installed the node, this wasn’t a good look. The picture doesn’t convey what a mess it made of the fake grass. I did take two NBN reps from Sydney to this location and show them this mess after one of our meetings. May or may not have triggered action.

Then NBN fixed the lawn and made the pits less conspicuous:

Anyway, good job NBN/contractors.

Steve Ulrich

Gleneagles Estate NBN Committee

One Comment

Leave a Reply to Neil Bolton Cancel reply

Your email address will not be published. Required fields are marked *