Fibre being installed in Gleneagles Estate

Fibre has started to be laid in Stage 2 of Gleneagles Estate, as part of the first trial group of FTTP installations. Construction is expected to be completed within the next two weeks.

Congratulations again to all those who have participated, and in particular the committee and co-ordinators who have got us to this point.

Roll of 12F fibre
Pulling Fibre though the street conduit
1F fibre optic cable which will connect to multipart splitters in pits

Thanks & Cheers

Steve Ulrich

Gleneagles Estate FTTP NBN Committee