A number of Telstra users have reported lost emails. Has this impacted you? Please comment if so. It appears that there is reluctance from Telstra to acknowledge it
Hi There are now plans lodged to upgrade the mobile phone tower on Kambah Pool Road to 4g. Presumably this would include microwave backhaul upgrades, which will result
Work has well and truly started on the second node at Stage 2. (8/3/2016) (Thanks to Vincent for the picture) (11/3/2016) (14/3/2017) (Thanks for the picture Vincent)
IT Wire reports that during senate estimates it was confirmed that the days of ‘free fibre’ were well and truly over, and areas which were connected by FTTN