Costing Estimator for Registered users – update
Changes to Estimator Costs
After obtaining some maps which indicate Telstra cable runs, some adjustments have been made to how calculations are made for residents in DA71. This will impact the estimates for residents in the area.
Note the estimate is simply that – an estimate based on the best information we have at the time, and a number of factors can impact the final cost to the end user. What is considered to be very accurate however, is the impact of cost sharing on the final price to end users – which is significant.
How can I get this cheaper?
This is something that is directly under your control.
Talk to your neighbours and encourage them to register and participate. Its that simple. This will have a DIRECT impact on final figures for premises owners in your area.
The discounts on design and quote fees are only available to registered users, who supply their information by the deadline (30 November 2016), and provide a receipt number to the project (through the project website) once they have lodged their Technology Choice Application with NBN.
Changes to Estimator functions
- Added Estimate History;
- Added pathway (premises to anticipated node/multiport location) to map;
- Added number of participants per area, and position in participation list, relative to pillar/multiport anticipated point; and
- Added “Estimate if not involved in cost sharing” to show how much it is likely to cost if you do not participate in the cost sharing offered by the project.
Any questions or comments, please email nbn@gleneaglesestate.net
Thanks
Steve
Gleneagles Estate NBN Committee

How do I lodge the Technology Choice Application with NBN?
We cannot submit applications until the area is classed as “Ready For Service” (ie. once they have finished installing nodes, and systems at their end can accommodate orders from ISPs from customers from the area).
I have had the debate with them for the last two years now back and forth over this particular point don’t worry.
At this stage – we will be RFS in 2018. When people are able to submit applications, we will have a place on the online form on this website for people to enter their receipt numbers.
We will be giving people notice about this well ahead of time, and the keeping residents informed etc.
The design phase for Kambah starts in December 2016 – hence the deadline of November 2016 so we can supply the resident information to NBN to try and encourage them to take this into consideration with the design.
The timeframe was one thing we couldn’t get any traction on – as this is a highly political program of work, which I presume NBN have absolutely no latitude or discretion at their end to do so.
It is very important that we get “all our ducks in a row” with this, given how volatile this space has been.
Thanks Steve. Fingers crossed.
I have re-registered but cannot find anywhere to add my name for a decreased estimation price. At this stage it would appear I am up for $10,000 is this correct?
I have emailed you direct to assist.
Hi Steve, I was not at home when you (or someone else representing the community) knocked on the door this weekend. You will be pleased to no that my neighbor updated me. The activity that you are working on is something i will be very keen to be part of. I registered on the site yesterday. Is that all i need to do for now or do i need to do anything else to lodge my interest.
Thanks in advance.
Yep the committee did the rounds of some of the estate yesterday.
Spreading the word to your neighbours the the best thing people can do (apart from registering their interest of course).
As long as you have updated your details with street number and street,and ticked that you will be putting in an individual premises technology choice application – that will keep you in the loop and ensure that when the time comes you are included in the design and quote process with NBN and the project.